The City of Colton will provide water service to the project. Rancho Rancho del Prado will construct a 1.5M gallon reservoir that will connect to and upgrade the existing water distribution system so that it is capable of not only meeting the projected water demands and fire flows for the project, but improves the system for the adjacent existing neighborhoods. These upgrades will ensure better domestic service to the residents of Crystal Ridge, Prado Lane, and Rancho del Prado.