Significantly—and the existing water system will actually be improved. A 1.5M gallon reservoir will be constructed along with a looped transmission pipeline creating a looped water system between Prado and Crystal Ridge Lanes. This looped system improves water pressure, redundancy, and firefighting capacity for the area. In addition, the Crystal Ridge development would be provided consistent and reliable domestic and emergency service that does not depend on an emergency pump station. This is a vast and necessary improvement.